Bass River Marina and Yachting Center
Project Information
Project Location: |
New Gretna, NJ |
Project Contract Amount: |
$35,800,000 |
Project Executive: |
Conrad F. Hall, Sr. |
Project Manager: |
Conrad F. Hall, Jr. |
Project Description
- Design/Build new 40,000 sq. ft. structural steel framed indoor boat storage/rack building for 160 boats
- Reconstruction of roadway, curbs & drainage along State Highway Route 9 with extensive NJDOT coordination
- Reinforced concrete, footings and foundation walls
- Structural steel frame, exterior metal wall panels and roofing
- Sophisticated interior boat storage racking system built of structural steel and capable of holding 165 boats
- Interior concrete floor slab with Wisbro radiant floor tubing heating system
- Electrical lighting and power systems
- Boat maintenance shop and repair facilities
- Jib crane and hoist for lifting boats and engines
- Rehabilitate 265-slip marina
- Rebuild bulkheads and replace floating docks
- Rebuild infrastructure on 25-acre site
- Build new pool, club and shower facilities
- Renovate existing boatsman shop, marina offices and sales room
- Project completed in eight months without disrupting ongoing operations; finished four months ahead of schedule