Additions and Renovations to Bloomfield High School
Project Information
Project Location: |
Bloomfield, NJ |
Project Contract Amount: |
$60,550,000 |
Project Executive: |
Mark D. Hall |
Project Managers: |
Anthony Guerriero/Chris Wolf |
Superintendents: |
Anthony Corrado/Richard Lefebvre |
Construction Manager |
VTM |
Architect: |
DIGroupArchitecture - Jeff Venezia |
Project Description
- Additions and renovations of a 475,000 sq.ft. high school
- 100+ classrooms
- Two cafeterias and kitchens
- Extensive kitchen equipment
- Two new gymnasiums built over an existing gymnasium
- Project situated on entire city block
- Five-story building with limited site access
- Extensive asbestos abatement and lead-based paint abatement
- Extensive building and selective demolition
- Extensive cutting and patching to match existing finishes
- Extensive site utilities
- Concrete and unit paver sidewalks
- Synthetic running track, pole vault and long jump
- Football and baseball fields
- Grandstands and Field House with locker rooms
- Extensive turf/landscaping
- Polished concrete and terrazzo floor finish
- Extensive interior architectural millwork/woodwork
- EPDM roofing, skylights and roof accessories
- Curtainwall and window replacement for the entire school
- Ceramic/quarry tile finishes
- Wood athletic floors
- Resinous floors and laboratories
- Acoustic baffles/clouds and sound panels
- Acoustical wall and ceiling treatments
- Painting and vinyl wall covering
- Drywall and plaster finishes
- Visual display boards throughout
- New restored lockers throughout
- All new signage
- New stage curtains/rigging
- Photo lab equipment
- Basketball backstops/scoreboards/volleyball equipment
- Auditorium theatre seating
- Soundproof rooms
- Electric traction elevator and wheelchair lifts
- Nine phases - Owner occupied facility throughout construction
- Excavation/dewatering - deep cut for new lower level
- Cast stone and brick masonry facades
- Site amenities
- Structural concrete foundation and retaining walls