Millville Senior High School - Additions and Alterations Design/Build
Project Information
Project Location: |
Millville, NJ |
Project Contract Amount: |
$123,008,329 |
Project Executive: |
Mark D. Hall |
Project Manager: |
Robert Fucetola |
Owner/Contact Person: |
NJ Schools Development Authority / Andrew Oakley |
Owner's Address: |
32 East Front Street, Trenton, NJ |
Owner's Phone: |
609-858-5179 |
Architect: |
Paulus Sokolowski & Sartor Engineering - Ron Weston, AIA, LEED AP |
Architect's Address: |
67A Mountain Blvd., Warren, NJ |
Architect's Phone: |
732-584-0375 |
Project Description
- Design and build a new, three story 86,000 square foot addition
- Design and build a new, two story 104,000 square foot addition
- New 36,000 square foot auditorium and north infill addition with ancillary areas
- 60,000 square feet of renovations throughout the existing facilities
- Classrooms for 2000+ students
- Cafeteria and kitchen
- Extensive kitchen equipment
- Project situated on several acres
- Excavation and compaction
- Construct underground stormwater retention system
- Site utilities - storm, sanitary, water
- Structural foundations
- Structural steel framed building
- White (LEED) membrane roofing
- Prefab metal canopies
- Solar panels
- Exterior decorative block veneer
- Precast stone
- Seamless flooring, carpet, VCT and wood flooring throughout
- Acoustical ceilings and wall panels
- Extensive architectural casework
- Gymnasium and Stage equipment
- Theatrical rigging and equipment
- Cyclorama curtain
- Auditorium wood veneer reflector panels
- Auditorium seating
- State of the art television studio
- Laboratory classrooms
- Pre-fab music sound rooms
- Hydraulic elevator (machineless room)
- ADA platform lift
- Aluminum and glass entrances/windows
- Window treatments
- Markerboards/tackboards
- Telescoping gym seating and athletic equipment
- Plumbing, fire protection, HVAC & electrical systems
- IT systems - data, security, sound, internet
- Communications, CCTV and fire alarm systems
- LEED Silver certification goal with the USGBC
- Extensive exterior parking facilities